Cleanroom Expansion — Phase 2 Utility Corridor
Laser scanning and Scan-to-BIM of a 120,000 sf utility corridor feeding an active cleanroom expansion with tight overhead clearances.
Cleanroom FacilitySouthwest USQ4 2025 – Q2 2026
2,400 ft
Corridor length
680
Scan setups
6 mm
Clearance tolerance
8 days
Capture window

Semiconductor & Cleanroom
The challenge
What we were solving for.
New utility routing had to fit within 18-inch overhead clearances above an active corridor serving the cleanroom.
Any contact with existing process lines risked contamination shutdowns costing $500K+ per event.
Our approach
How BimCon delivered.
- Captured the corridor over three weekend windows with terrestrial scanners at 6 mm resolution.
- Built a verified-as-built model and coordinated new CDA, PCW, and exhaust routing against confirmed clearances.
Scope of work
What BimCon delivered.
Reality capture
Survey-grade terrestrial and mobile LiDAR capture, registered to a unified coordinate system.
Scan-to-BIM modeling
Verified-as-built Revit model authored from the registered point cloud at the agreed LOD.
BIM coordination
Multi-trade clash detection, weekly cadence, published issue log and resolution tracking.
Deliverables
In your hands.
- Registered point cloud (.RCP / .RCS)
- E57 / LAS / PTS exports
- HDR 360° panoramas registered to scan stations
- Scan-to-BIM Revit model at agreed LOD
- LOD 350 verified-as-built deliverable
- Federated Navisworks model
- Clash detection & coordination reports
- BCF issue log with resolution tracking
By the numbers
Project metrics.
2,400 ft
Corridor length
680
Scan setups
6 mm
Clearance tolerance
Services on this project
Capabilities delivered.
Related work
More from Semiconductor & Cleanroom.
Have a project like this?
Send us your scope and we'll respond within one business day with a quote and a timeline.
Request Project Review
Response within one business day.
Confidential · NDA-ready · Nationwide deployment