    Cleanroom Expansion — Phase 2 Utility Corridor

    Laser scanning and Scan-to-BIM of a 120,000 sf utility corridor feeding an active cleanroom expansion with tight overhead clearances.
    Cleanroom FacilitySouthwest USQ4 2025 – Q2 2026
    2,400 ft
    Corridor length
    680
    Scan setups
    6 mm
    Clearance tolerance
    8 days
    Capture window
    Cleanroom Expansion — Phase 2 Utility Corridor
    Semiconductor & Cleanroom

    The challenge

    What we were solving for.

    New utility routing had to fit within 18-inch overhead clearances above an active corridor serving the cleanroom.

    Any contact with existing process lines risked contamination shutdowns costing $500K+ per event.

    Our approach

    How BimCon delivered.

    • Captured the corridor over three weekend windows with terrestrial scanners at 6 mm resolution.
    • Built a verified-as-built model and coordinated new CDA, PCW, and exhaust routing against confirmed clearances.

    Scope of work

    What BimCon delivered.

    • Reality capture

      Survey-grade terrestrial and mobile LiDAR capture, registered to a unified coordinate system.

    • Scan-to-BIM modeling

      Verified-as-built Revit model authored from the registered point cloud at the agreed LOD.

    • BIM coordination

      Multi-trade clash detection, weekly cadence, published issue log and resolution tracking.

    Deliverables

    In your hands.

    • Registered point cloud (.RCP / .RCS)
    • E57 / LAS / PTS exports
    • HDR 360° panoramas registered to scan stations
    • Scan-to-BIM Revit model at agreed LOD
    • LOD 350 verified-as-built deliverable
    • Federated Navisworks model
    • Clash detection & coordination reports
    • BCF issue log with resolution tracking

    By the numbers

    Project metrics.

    2,400 ft
    Corridor length
    680
    Scan setups
    6 mm
    Clearance tolerance

    Have a project like this?

    Send us your scope and we'll respond within one business day with a quote and a timeline.

    Request Project Review

    Response within one business day.

    Confidential · NDA-ready · Nationwide deployment