Mission-critical & data centers
MEP-dense scans, white-space coordination, and as-built models for hyperscale and colo retrofits.
Production shutdowns are planned months in advance. If field conflicts push installation past the shutdown window, the cost isn't rework — it's lost production revenue.
We build the coordination model from as-built scans, run weekly clash detection, and produce installation sequence packages so every trade knows exactly what to install and when.
We start from laser-scanned existing conditions so the coordination model reflects what's actually in the plant — not 20-year-old drawings.
Deliverables are organized by installation phase and trade so the field team executes in order without waiting for RFI responses.
We verify maintenance access, pull paths, and crane clearances in the model before fabrication begins.
Federated clash detection and constructability review tuned to process piping, conveyance, and heavy equipment.
Or call (480) 717-1928
Explore deeper detail on the services and industries connected to BIM Coordination for Industrial.
The same disciplined capture, modeling, federated coordination, and QA workflow we run on mission-critical and public-sector programs — applied to BIM coordination for industrial on your specific scope.
Typical scan accuracy
Survey-grade laser capture
Quote & scope turnaround
On qualified RFPs
Field crew mobilization
National coverage
Project types delivered
Across 7 verticals
The same crews, standards, and QA process whether it's a 5,000 sf tenant fit-out or a campus-scale capital program.
MEP-dense scans, white-space coordination, and as-built models for hyperscale and colo retrofits.
Active-facility scanning with infection-control protocols, plus coordinated MEP/FP for renovations and additions.
Process piping, conveyor lines, and structural verification for retooling, expansions, and prefabrication.
Repeatable capture and modeling programs for portfolios, tenant fit-outs, and brand-standard rollouts.
Cleared workflows, NDAs, and CAD/BIM standards for federal, DOD-adjacent, and municipal facility programs.
Campus-wide as-builts, utility tunnels, and MEP rooms for capital planning and deferred-maintenance work.
Every engagement ends with a documented, versioned deliverable package — not a folder of loose files.
One repeatable, auditable path from field capture to a coordinated, owner-ready model.
Field crews capture the site with survey-grade laser scanners on a route designed for your scope and access window.
See the FAQ answerScans are registered, geo-referenced, and QA'd to a verified accuracy threshold before anything moves into modeling.
See the FAQ answerDiscipline-specific Revit/IFC models are built to the agreed LOD with consistent naming, families, and standards.
See the FAQ answerFederated review in Navisworks/BIM 360 — clashes resolved against existing conditions, not on the slab.
See the FAQ answerHand off the full package — model, point cloud, drawings, and walkthroughs — with a QA report and revision plan.
See the FAQ answerWe document credentials, name the standards we operate to, and ship a QA report on every project — so procurement, legal, and engineering all see the same proof.
Certifications & credentials
Industry standards we operate to
QA process indicators
Specific certificates of insurance, signed NDAs, and the BIM Execution Plan we'll operate under can be provided on request during scoping.
The questions enterprise owners, GCs, and design teams ask before scoping a capture or modeling engagement.
Have a BIM coordination for industrial scope to price?
Send us the building, schedule, and trades involved. We'll respond with a quoted scope, accuracy target, and a recommended capture and modeling approach.
Send us the scope, shutdown timeline, and trades involved. We'll return a coordination proposal.
Response within one business day.
Confidential · NDA-ready · Nationwide deployment