Skip to content

    Midwest Hyperscale Data Hall — 48 MW Expansion

    Full MEP coordination and fabrication-level detailing for a 48 MW data hall expansion. Weekly clash cycles across 12 trades with module-based prefab delivery.
    Hyperscale Data CenterMidwest USQ2 2025 – Q4 2026
    48 MW
    Capacity
    12
    Coordinated trades
    4,200+
    Clashes resolved
    $1.8M(est.)
    Field rework avoided
    Midwest Hyperscale Data Hall — 48 MW Expansion
    Data CentersRepresentative Project

    The challenge

    What we were solving for.

    An aggressive 18-month delivery window required overlapping design, fabrication, and field installation across twelve MEP and structural trades.

    Module-based prefabrication left no margin for field-routed corrections — every conflict had to be resolved before steel was cut.

    Our approach

    How BimCon delivered.

    • Stood up a weekly clash detection cadence in Navisworks with a published resolution log shared across trade partners.
    • Issued LOD 400 fabrication models for chilled water, busway, and containment, sequenced to match the prefab vendor's release schedule.
    • Embedded a BimCon coordinator on the GC's Big Room two days per week to close issues in real time.

    Scope of work

    What BimCon delivered.

    • Reality capture

      Survey-grade terrestrial and mobile LiDAR capture, registered to a unified coordinate system.

    • BIM coordination

      Multi-trade clash detection, weekly cadence, published issue log and resolution tracking.

    • MEP detailing

      LOD 400 fabrication-level modeling for mechanical, electrical, plumbing, and process trades.

    Deliverables

    In your hands.

    • Registered point cloud (.RCP / .RCS)
    • E57 / LAS / PTS exports
    • HDR 360° panoramas registered to scan stations
    • Federated Navisworks model
    • Clash detection & coordination reports
    • BCF issue log with resolution tracking
    • LOD 400 fabrication models per trade
    • Fabrication / shop-drawing support package

    By the numbers

    Project metrics.

    48 MW
    Capacity
    12
    Trades coordinated
    4,200+
    Clashes resolved

    Have a project like this?

    Send us your scope and we'll respond within one business day with a quote and a timeline.

    Request Project Review

    Response within one business day.

    Confidential · NDA-ready · Nationwide deployment