GMP Manufacturing Suite — As-Built Documentation
Verified-as-built capture of an active GMP fill-finish suite supporting a planned line expansion. Cleanroom-compliant scanning across six weekend mobilizations.
GMP Manufacturing SuiteNortheast USQ1 2026 – Q3 2026
32,000 sf
Suite area
540
Scan setups
ISO 5
Cleanroom class
0
Contamination events

Life Sciences & PharmaRepresentative Project
The challenge
What we were solving for.
Existing record drawings predated three rounds of equipment changes, leaving the engineering team without a reliable baseline for line expansion.
All capture work had to occur during validated cleanroom shutdown windows without disrupting CQV cycles.
Our approach
How BimCon delivered.
- Mobilized cleanroom-gowned crews across six weekend windows with decontaminated terrestrial scanners.
- Delivered an LOD 350 verified-as-built model linked to the owner's equipment registry for downstream design use.
Scope of work
What BimCon delivered.
Reality capture
Survey-grade terrestrial and mobile LiDAR capture, registered to a unified coordinate system.
As-built documentation
Verified-as-built drawing and model package covering existing conditions and tie-in zones.
Scan-to-BIM modeling
Verified-as-built Revit model authored from the registered point cloud at the agreed LOD.
Deliverables
In your hands.
- Registered point cloud (.RCP / .RCS)
- E57 / LAS / PTS exports
- HDR 360° panoramas registered to scan stations
- Existing conditions documentation set
- Tie-in zone interface drawings
- Scan-to-BIM Revit model at agreed LOD
- LOD 350 verified-as-built deliverable
By the numbers
Project metrics.
32,000 sf
Suite area
540
Scan setups
ISO 5
Cleanroom class
Services on this project
Capabilities delivered.
Related work
More from Life Sciences & Pharma.
Have a project like this?
Send us your scope and we'll respond within one business day with a quote and a timeline.
Request Project Review
Response within one business day.
Confidential · NDA-ready · Nationwide deployment