    Pharma Utility Corridor — MEP Coordination

    LOD 400 process utility coordination for WFI, clean steam, CDA, and process exhaust feeding a multi-suite pharmaceutical campus expansion.
    Pharma Utility CorridorMulti-State PortfolioQ3 2025 – Q2 2026
    1,800 ft
    Corridor length
    9
    Process services
    320
    Spool drawings
    $0
    Field rework
    Pharma Utility Corridor — MEP Coordination
    Life Sciences & PharmaRepresentative Project

    The challenge

    What we were solving for.

    Nine process utilities had to share a single overhead corridor with strict slope, fall-protection, and access requirements.

    Fabricator was on a four-week lead-time cycle that demanded fully coordinated spool packages on a fixed cadence.

    Our approach

    How BimCon delivered.

    • Built a federated coordination model from architectural, structural, and trade contributors with weekly clash sessions.
    • Released spool drawings on a two-week cadence aligned to the fabricator's queue.

    Scope of work

    What BimCon delivered.

    • BIM coordination

      Multi-trade clash detection, weekly cadence, published issue log and resolution tracking.

    • MEP detailing

      LOD 400 fabrication-level modeling for mechanical, electrical, plumbing, and process trades.

    • Scan-to-BIM modeling

      Verified-as-built Revit model authored from the registered point cloud at the agreed LOD.

    Deliverables

    In your hands.

    • Federated Navisworks model
    • Clash detection & coordination reports
    • BCF issue log with resolution tracking
    • LOD 400 fabrication models per trade
    • Fabrication / shop-drawing support package
    • Scan-to-BIM Revit model at agreed LOD
    • LOD 350 verified-as-built deliverable

    By the numbers

    Project metrics.

    1,800 ft
    Corridor length
    9
    Process services
    320
    Spool drawings

    Have a project like this?

    Send us your scope and we'll respond within one business day with a quote and a timeline.

    Request Project Review

    Response within one business day.

    Confidential · NDA-ready · Nationwide deployment