Skip to content

    GMP Manufacturing Suite — As-Built Documentation

    Verified-as-built capture of an active GMP fill-finish suite supporting a planned line expansion. Cleanroom-compliant scanning across six weekend mobilizations.
    GMP Manufacturing SuiteNortheast USQ1 2026 – Q3 2026
    32,000 sf
    Suite area
    540
    Scan setups
    ISO 5
    Cleanroom class
    0
    Contamination events
    GMP Manufacturing Suite — As-Built Documentation
    Life Sciences & PharmaRepresentative Project

    The challenge

    What we were solving for.

    Existing record drawings predated three rounds of equipment changes, leaving the engineering team without a reliable baseline for line expansion.

    All capture work had to occur during validated cleanroom shutdown windows without disrupting CQV cycles.

    Our approach

    How BimCon delivered.

    • Mobilized cleanroom-gowned crews across six weekend windows with decontaminated terrestrial scanners.
    • Delivered an LOD 350 verified-as-built model linked to the owner's equipment registry for downstream design use.

    Scope of work

    What BimCon delivered.

    • Reality capture

      Survey-grade terrestrial and mobile LiDAR capture, registered to a unified coordinate system.

    • As-built documentation

      Verified-as-built drawing and model package covering existing conditions and tie-in zones.

    • Scan-to-BIM modeling

      Verified-as-built Revit model authored from the registered point cloud at the agreed LOD.

    Deliverables

    In your hands.

    • Registered point cloud (.RCP / .RCS)
    • E57 / LAS / PTS exports
    • HDR 360° panoramas registered to scan stations
    • Existing conditions documentation set
    • Tie-in zone interface drawings
    • Scan-to-BIM Revit model at agreed LOD
    • LOD 350 verified-as-built deliverable

    By the numbers

    Project metrics.

    32,000 sf
    Suite area
    540
    Scan setups
    ISO 5
    Cleanroom class

    Have a project like this?

    Send us your scope and we'll respond within one business day with a quote and a timeline.

    Request Project Review

    Response within one business day.

    Confidential · NDA-ready · Nationwide deployment