Hotel Tower Repositioning — Digital Twin
Digital twin handoff for a 32-story hotel repositioning, integrating verified-as-built model data with the property's facility management platform.
Hotel Tower RepositioningNortheast USQ3 2025 – Q4 2026
32
Floors
540
Keys
3,200
Assets tagged
1st pass
Brand reviews passed

Hospitality & EntertainmentRepresentative Project
The challenge
What we were solving for.
Repositioning required a unit-by-unit verified baseline across 32 floors of an occupied hotel.
Brand standards demanded a documentation deliverable usable by ownership, operations, and asset management long after project closeout.
Our approach
How BimCon delivered.
- Coordinated room-block scanning with revenue management to capture floors in stay-pattern-aware sequences.
- Delivered a federated digital twin tied to the property's facility management and capital planning platforms.
Scope of work
What BimCon delivered.
Digital twin integration
Federated as-operated model linked to live facility data sources and asset metadata.
As-built documentation
Verified-as-built drawing and model package covering existing conditions and tie-in zones.
Scan-to-BIM modeling
Verified-as-built Revit model authored from the registered point cloud at the agreed LOD.
Deliverables
In your hands.
- Federated digital twin model
- Asset metadata schema and integration map
- Existing conditions documentation set
- Tie-in zone interface drawings
- Scan-to-BIM Revit model at agreed LOD
- LOD 350 verified-as-built deliverable
By the numbers
Project metrics.
32
Floors
540
Keys
3,200
Assets tagged
Services on this project
Capabilities delivered.
Related work
More from Hospitality & Entertainment.
Have a project like this?
Send us your scope and we'll respond within one business day with a quote and a timeline.
Request Project Review
Response within one business day.
Confidential · NDA-ready · Nationwide deployment


